As of June 13 2002, biggest change is that the wire connectors are now in the Prep kits and not in the with the connector stations. For Reference, see:
http://www3.etcconnect.com/Community..._5F00_2002.pdf
Overview:
- Link and RFU have a separate power header.
- Headers are smaller.
- Header requires a flat head driver of no wider then 2.5 mm
- DMX PCB has two headers connected in parallel
- Two different DMX kits
- CAT5/UTP cable insulation displacement connector (IDC) header (For solid 24 awg)
- Standard Belden type cable header (stranded 16-24 AWG)
- New Part Numbers
- 4100A1012 DMX Preparation Kit
- 4100A1013 DMX Preparation Kit (IDC)
- 4100A1014 RFU Preparation Kit
- 4100A1015 ETCLink Preparation Kit